â–ş Listen Live
â–ş Listen Live

Upgrades coming to local highways

Over 480 kilometres of highways and side roads throughout B.C.’s southern Interior will be upgraded with new surfaces.

The B.C. government said this comes as the province invests more than $122 million on road resurfacing across the region.

A list of the projects set to get underway can be found below:

  • Highway 3 in Cranbrook (25.5 kilometres)
    • Conventional resurfacing on arterial and area side roads
  • Highway 1 near Revelstoke (15.2 kilometres)
    • Conventional resurfacing
  • Highway 93 from Roosville to Junction of Highway 3 (37 kilometres)
    • Seal coat
  • Highway 3B Trail area (14 kilometres)
    • Conventional resurfacing
  • Highway 22 from Trail to Castlegar (20 kilometres)
    • Hot in-place recycling
  • Highway 31A from New Denver to Fish Lake (13 kilometres)
    • Conventional resurfacing
  • Highway 6 from Nakusp to Burton (36 kilometres)
    • Hot in-place recycled asphalt resurfacing
  • Highway 33 Beaverdell to Carmi (9 kilometres)
    • Conventional resurfacing
  • Slocan Valley side roads (17 kilometres)
    • Conventional resurfacing
  • Highway 97 from Swan Lake to Hanna Road, intermittent (52 kilometres)
    • Hot in-place recycled asphalt resurfacing
  • Highway 3 from Riverside Campground to Keremeos (16 kilometres)
    • Conventional resurfacing
  • Highway 1 from Hoffman’s Bluff to Little River, intermittent (17 kilometres)
    • Conventional resurfacing
  • Cherryville area side roads (25 kilometres)
    • Conventional resurfacing
  • Highway 97C from Elkhart Brake Check to John’s Creek (23 kilometres)
    • Conventional resurfacing
  • Highway 1 from Valleyview to Orchards Walk and Barriere area side roads (40 kilometres)
    • Conventional resurfacing
  • Highway 97 from Lynes Pit to Cody and Quesnel area side roads (67 kilometres)
    • Conventional resurfacing
  • Highway 26 from Forest Service Road 500 to Wingdam (21 kilometres)
    • Conventional resurfacing

Drivers are asked to travel carefully and obey any road signs or on-site staff around construction sites.


Something going on in your part of the Kootenays you think people should know about? Send us a news tip by emailing [email protected].

Continue Reading

cjat Now playing play

ckqr Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

Clocks “fall back” an hour this weekend as daylight time ends

Clocks are set to “fall back” across much of Canada this weekend, as daylight time ends at 2 a.m. on Sunday, Nov. 2. The post Clocks “fall back” an hour this weekend as daylight time ends appeared first on AM 1150.

Trail RCMP overtime costs dropping

The City of Trail is on track to pay about one-fifth as much in RCMP overtime costs for the current fiscal year compared to the last one.

Battle is on between Smoke Eaters pipes

The two goaltenders left standing for the Trail Smoke Eaters after the injury to No. 1 puck stopper Cooper Michaluk will both get a chance to be "the guy."

Intersection of Davis Street and Cook Ave temporarily closed on Friday

The intersection of Davis Street and Cook Avenue will be closed to all traffic on Friday, Oct. 31, from 7 a.m. to 5 p.m.

B.C. Conservatives propose higher tax caps to offset municipal losses from pipeline assessment

Proposed legislation from the B.C. Conservatives would raise taxation rate caps for municipalities, which are bracing for a potentially major financial hit from upcoming assessment changes. The post B.C. Conservatives propose higher tax caps to offset municipal losses from pipeline assessment appeared first on AM 1150.
- Advertisement -